Paver base calculator for New Mexico

The compacted layer below the pavers helps keep a patio level in five years. Use this calculator to size it by the ton.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

A paver surface costs several times more per square foot than its stone foundation, but trouble usually begins in that lower layer. Use this calculator to estimate compacted crusher run or a similar blend at 1.5 tons per cubic yard: 4 inches for walking areas and 6-8 for cars. The +10% compaction allowance is selected by default. Keep bedding sand separate at a strict 1-inch layer, using its own calculator.

Base sizing

  1. Find the paved area in feet, then carry the base 6 inches beyond each open paver edge. This gives the edge restraint solid support.
  2. Use 4 inches of compacted material for walkways and patios. Allow 6 for clay soil or driveways, and use 8 beneath driveways on soft ground.
  3. Take cubic feet ÷ 27 for yards, then x 1.5 for tons. Leave the +10% allowance on.
Tons = (Base area sq ft × Compacted depth in ÷ 12) ÷ 27 × 1.5 × 1.10
Excavation depth = base + 1" bedding + paver thickness − reveal

Project depth and coverage

ProjectCompacted base depth1 ton covers
Walkway or garden path4 inches≈ 54 sq ft
Patio or seating area4-6 inches≈ 43 sq ft
Driveway with cars6-8 inches≈ 31 sq ft
Clay or soft subgradeadd 2 inches + fabricn/a

Excavation layers from lawn to finished paver

Figure the excavation by adding the layer depths. For a standard patio, use 4 inches of base, 1 inch of bedding sand, and a 2 3/8 inch paver finished even with the lawn. That comes to a 7.5-inch dig, adjusted for however much reveal you leave above grade. Put that depth on a stake and check it as the hole is dug. Going too deep means removing extra soil, then paying for more stone to restore the level. Run the Dirt Calculator backward to estimate the yards coming out of the hole.

Base installation practices

  • Use a plate compactor on 2-inch lifts, with a light mist on each layer. Base compacts more tightly when damp than when dry.
  • Give the compacted base a 2-3% slope away from the house. Bedding sand and pavers will follow that grade.
  • Place edge restraint over the compacted base rather than lawn soil. The 6-inch overhang supports the restraint.
  • Where clay is present, put woven geotextile below the base. It keeps stone from gradually sinking into the subgrade through wet seasons.
  • Base depth cannot be replaced with a deeper sand layer. Sand shifts, and that shortcut can create a wavy patio.

Re-laying old pavers: check the base

When re-laying a patio, the existing base may be reusable. Take up the pavers, remove the old bedding sand, and check the base. If it is still level, firm, and draining, install a fresh 1-inch bedding layer; the stone requirement drops to a tenth of a new installation. Remove the base if there are low spots, soft areas, or standing water. In monsoon runoff, those issues need correction before the pavers go back.

Example: a 16 x 12 patio

For 192 square feet of paving, add the 6-inch overhang along three open sides and use 210 as the base footprint. With 4 inches compacted, 210 x 0.333 = 70 cubic feet = 2.6 cubic yards, or about 3.9 tons and 4.3 with the allowance. Order 4.5 tons of crusher run and 0.9 tons of bedding sand from the Paver Sand Calculator in one free delivery. Schedule the drop after excavation, since a stone pile left on a lawn for two weeks leaves a dead rectangle.

Questions on base depth, digging and tonnage

How can I calculate my paver base quantity?
Include a 6-inch border with the paved area. Multiply that by compacted depth in feet, divide by 27, multiply by 1.5 tons, then add 10%. A 10 x 10 patio with 4 inches comes to about 2.2 tons, so order 2.5.
Will 2 inches of paver base work?
No. Two inches is for leveling, not for a base. For foot traffic, use four compacted inches at minimum; less base often causes dips and rocking pavers.
What base depth is needed for pavers?
Use four compacted inches under patios and paths, and 6-8 where cars travel. Add 2 extra inches for clay or wet ground. In New Mexico, grade the base to shed monsoon water, especially above caliche hardpan.
How far down should I dig for pavers?
Add the base, 1 inch of bedding, and the paver thickness, then subtract any reveal above grade. Standard 2 3/8 inch pavers with a 4-inch base need about 7.5 inches below finished height.
For paver base, crusher run or screenings?
Use crusher run, or road base, as the structural layer through the full 4-plus inches. Put screenings only in a thin leveling layer above compacted base. Screenings alone retain water and can pump under load.
Can pavers be installed without base material?
Yes on an existing sound concrete slab, with a bedding layer and drainage gaps. No on soil. Pavers laid directly on dirt move with frost and rain, showing unevenness in one season.

A stable base supports the finished pavers.